6-6
OM EZ17 us 1.0 * ez17t600.fm
6
1.
– see chapter “ Transporting” on page 2-11
2. Fit an empty standard bucket and lock it safely.
3. Remove all dirt from the machine.
4. Place the machine on firm, level and horizontal ground.
5. Tilt in the standard bucket and lower it to transport position.
6. Fully raise the boom.
7. Pull the stick toward the machine.
8. Raise the stabilizer blade.
9. Lock the upper carriage.
10.Position the boom straight ahead at the center of the machine.
Position the boom straight ahead at the center of the machine.
11.Stop the engine.
12.Operate the control lever repeatedly to release the pressure in the
hydraulic system.
13.Raise the control lever base.
14.Remove the starting key and carry it with you.
15.Remove loose objects from inside the machine.
16.Get off the machine, and close and lock all covers.
17.Install suitable slings at the points provided for lifting the machine.
18.Slowly raise the machine until there is no more contact with the
ground.
19.Wait until the machine does not swing any more.
20.If the balance and the condition and position of the slings is correct,
slowly raise the machine to the required height and load it.
Mandatory lengths
L
of the lifting gear:
Information
The manufacturer’s warranty shall not apply to accidents or damage
caused by loading or transporting the machine.
Fig. 163
L
L
Length
Dimension
L
Minimum 1300 mm (51 in)
Summary of Contents for EZ17
Page 12: ...1 6 OM EZ17 us 1 0 ez17v100 fm 1 Notes...
Page 38: ...3 10 OM EZ17 us 1 0 ez17e300 fm 3 Warning labels Fig 11 symbolic representation...
Page 43: ...OM EZ17 us 1 0 ez17e300 fm 3 15 3 Labels Fig 24 symbolic representation...
Page 48: ...3 20 OM EZ17 us 1 0 ez17e300 fm 3 Notes...
Page 138: ...5 56 OM EZ17 us 1 0 ez17b510 fm 5 Notes...
Page 146: ...6 8 OM EZ17 us 1 0 ez17t600 fm 6...
Page 198: ...7 52 OM EZ17 us 1 0 ez17w710 fm 7 Notes...
Page 202: ...8 4 OM EZ17 us 1 0 ez17b800 fm 8 Notes...
Page 222: ...9 20 OM EZ17 us 1 0 ez17t900 fm 9 Dimensions Overview EZ17 Fig 227...