Working with a hydraulic hammer
NOTICE
In order to avoid damage to the machine or hydraulic hammer, observe
the following points:
►
Observe the Operator’s Manual of the hydraulic hammer.
►
Never use the hammer horizontally or upward.
►
Do not use the hammer to raise loads.
►
Do not hit the hammer against rocks, concrete, etc.
►
Do not use the hammer in the same spot uninterruptedly for more than
15 seconds.
►
Do not raise the machine with the boom.
►
Working with the hydraulic cylinders or the boom fully extended is
prohibited.
►
Do not swivel the Powertilt unit beyond 30° during hammer operation,
otherwise the load on the boom increases enormously.
►
Stop work immediately if a hydraulic hose moves back and forth in an
unusual manner. The pressure accumulator could be malfunctioning.
Contact a Wacker Neuson service center and have the malfunction
rectified immediately.
►
Do not use the impact force of the attachment to perform demolition
work. Broken or falling pieces can cause damage to the equipment.
Hammer pedal – AUX I (option)
1. Switch over to hammer operation. The ball-type cock is located on the
right in traveling direction in the machine.
Switching on hammer operation:
Press pedal
3
to the left.
Switching off hammer operation:
Release pedal
3
.
Fig. 107
Hammer opera-
tion (single-cir-
cuit function)
Auxiliary
hydraulics
(dual-circuit
function)
Fig. 108
3
Summary of Contents for EZ17
Page 12: ...1 6 OM EZ17 us 1 0 ez17v100 fm 1 Notes...
Page 38: ...3 10 OM EZ17 us 1 0 ez17e300 fm 3 Warning labels Fig 11 symbolic representation...
Page 43: ...OM EZ17 us 1 0 ez17e300 fm 3 15 3 Labels Fig 24 symbolic representation...
Page 48: ...3 20 OM EZ17 us 1 0 ez17e300 fm 3 Notes...
Page 138: ...5 56 OM EZ17 us 1 0 ez17b510 fm 5 Notes...
Page 146: ...6 8 OM EZ17 us 1 0 ez17t600 fm 6...
Page 198: ...7 52 OM EZ17 us 1 0 ez17w710 fm 7 Notes...
Page 202: ...8 4 OM EZ17 us 1 0 ez17b800 fm 8 Notes...
Page 222: ...9 20 OM EZ17 us 1 0 ez17t900 fm 9 Dimensions Overview EZ17 Fig 227...