E 2200 / E 3000ES
Operation
wc_tx001667gb.fm
47
4.15
Setting the Operating Temperature
Operating
temperature
Once the HTF is preheated, set the temperature controller to the operating
temperature. Use the chart below as a guide.
Operation type
Recommended Temperature Setting
Ground thawing
80°C (180°F)
Concrete curing
7°C (20°F) above the desired temperature of the
concrete
Air heating
80°C (180°F)
Summary of Contents for E 2200
Page 1: ...0192779 001 1210 0 1 9 2 7 7 9 Operator s Manual Hydronic Surface Heater E 2200 E 3000ES...
Page 4: ...Foreword 4 wc_tx001665gb fm...
Page 8: ...8 wc_bo0192779en_001TOC fm Table of Contents E 2200 E 3000ES...
Page 19: ...E 2200 E 3000ES Safety Information wc_si000540gb fm 19 Notes...
Page 64: ...Operation E 2200 E 3000ES 64 wc_tx001667gb fm Notes...
Page 90: ...Burner Setup E 2200 E 3000ES 90 wc_tx001669gb fm Notes...
Page 107: ...E 2200 E 3000ES Maintenance wc_tx001670gb fm 107 Notes...
Page 113: ...E 2200 E 3000ES Technical Data wc_td000422gb fm 113 9 4 Dimensions cm in...
Page 124: ...Schematics E 2200 E 3000ES 124 wc_tx001672gb fm 10 Schematics 10 1 Electrical Schematic...
Page 128: ...Schematics E 2200 E 3000ES 128 wc_tx001672gb fm 10 3 Burner System Circuit...
Page 129: ...E 2200 E 3000ES Schematics wc_tx001672gb fm 129 10 4 Circulation System Circuit ghi_gr005662...
Page 130: ...Schematics E 2200 E 3000ES 130 wc_tx001672gb fm 10 5 Rewind System Circuit...
Page 131: ......