![W2P Engineering PowerVat 250 Operating Manual Download Page 40](http://html1.mh-extra.com/html/w2p-engineering/powervat-250/powervat-250_operating-manual_3088721040.webp)
39
7.1.
Reduce Z-Axis
Z-Axis 0
in 0.1
mm increments until the steel washers of the
building platform firstly lift off the magnets of the z-stage (see "Knocking
Test"). Make sure to check all 3 washer/magnet contacts and stop
reducing
Z-Axis 0
if one or more washers lift off.
7.2.
Increase
Z-Axis 0
in 0.05
mm increments (1 or 2 times) until the building
platform does not lift off the magnets any more. The building platform
should now apply little pressure on the film but should not lift off the
magnets if they are activated during the printing process.
8.
Enter the final value for
Z-Axis 0
9.
To unlock the PowerVat, enter the insertion value for
Stretcher 0
determined
Go to Position
10.
Confirm settings by pressing
Next
repeatedly until the green tick appears
→
press the green tick to save the settings.
Knocking Test: By tapping above the magnet positions on the building platform,
you can easily determine whether the building platform is already in contact with
the magnets (dull knocking sound) or whether there is a gap between the building
platform and the magnets (bright knocking sound).