VWR
Puranity TU+ |
39
Initial start up
Putting the system into operation
NOTE!
The system must warmed up or cooled down to room temperature before being put into
operation.
CAUTION
Check that all connections have been made as described in Chapter 7 “Installation” on
page 21 or shown in the bottom diagram.
1. Concentrate connector for outer diameter 1/4“ tube
2. Feedwater connector for outer diameter 1/4“ tube
3. Tank overflow connector for outer diameter 1/4“ tube
4. Tank back flow connector for outer diameter 1/4“ tube
5. Tank flow connector for outer diameter 1/4“ tube
6. Concentrate connector for outer diameter 1/4“ tube
7. Feedwater connector for outer diameter 1/4“ tube
1
2
3
Connections Puranity TU 3+/6+
Connections Puranity TU 12+
4
5
6
7
Summary of Contents for Puranity TU 12 UV+
Page 6: ...vi Puranity TU VWR...
Page 18: ...Extend of delivery 10 Puranity TU VWR Chapter 3...
Page 20: ...Intended use of the device 12 Puranity TU VWR Chapter 4...
Page 44: ...Flow chart 36 Puranity TU VWR Chapter 8...
Page 46: ...How the Puranity TU system functions 38 Puranity TU VWR Chapter 9...
Page 72: ...Equipment disposal 64 Puranity TU VWR Chapter 14...
Page 76: ...Consumables 68 Puranity TU VWR Chapter 16...
Page 77: ...VWR Puranity TU 69 Terminal assignment...
Page 78: ...Terminal assignment 70 Puranity TU VWR Chapter 17...
Page 80: ...Maintenance record 72 Puranity TU VWR Chapter 18...
Page 84: ...76 Puranity TU VWR Index...