8.5 Servicing intervals
Servicing interval
A
B
C
1 shift operation
Before start of work
Monthly
Annual
2 shift operation
Before start of work
Weekly
Monthly
3 shift operation
--
--
--
NOTE!
The intervals given in the servicing table are standard values for normal operating conditions.
The intervals are to be shortened appropriately under more intensive working conditions, multiple
shift operation and longer working times.
Safety devices are to be tested monthly.
INFORMATION!
If not otherwise stated in the separate servicing tables, more precise information on the exact
settings is to be found in the chapter "Controls and settings work before first starting up/re-starting
of line".
The precise replacement work is described in the chapter "Servicing and Repairs".
Servicing intervals - E-motor 5,5kW and motor safety switch star-delta
Work to be performed
A
B
C
Checking of the electrical connections, cable links, switches, drives
and fusing
X
Check strap pulleys for visible signs of damage
X
Check that the fixture screws are tight
X
Servicing intervals
– stoning blades
Work to be performed
A
B
C
Check rotor blades for visible signs of damage
X
Check strap pulleys for visible signs of damage
X
Check that the fixture screws are tight
X
Servicing intervals
– bearings
Work to be performed
A
B
C
Check bearings for visible signs of damage
X
Grease lubricate bearings
X
Check that the fixture screws are tight
X