- Know the start and finish positions, load lifting
position and setting position.
- Know the machine configuration, especially the
dipper arm and boom lengths and track size.
- Choose the correct lifting chart taking into
account all attachments and rigging materials
that will be used during the lift. The weight of
the rigging materials and attachments, should
be deducted from the load capacity.
Warm up the machine to normal working
temperatures.
Position the machine on firm level ground.
Properly set outriggers and blade when
applicable.
Once the load is properly rigged, ensure all
ground workers are clear of the load and the
machine. If guiding of the load is necessary, use
ropes or other type of slings tied to the load to
keep ground workers at a safe distance.
Use a trained signalman to direct all aspects of
the move.
Do not use the swing or arm-in operation to drag
a load.
Operating techniques
Lifting objects
129
Summary of Contents for EC15E
Page 6: ......
Page 10: ......
Page 237: ......
Page 238: ...236 Alphabetical index Ref No 20051662 A Volvo Eskilstuna English ...