6-13
•
For all the other settings, follow the same steps as the freezer pressure switch (FPS2), except replace
Step 2 with the following:
Setting
Step 2 Action
For Bin Level Control (BC2) =
OUTR
2
For Low Pressure Safety =
OUTR
3
For High Pressure Safety =
OUTR
4
For Defrost Pressure Switch
(DPS) = OUTR
5
For Condenser Pressure
Switch (CPS) = OUTR
6
Summary of Contents for Tube-Ice HFO10
Page 2: ......
Page 6: ......
Page 10: ......
Page 12: ......
Page 16: ...2 4 Figure 3 Water Cooled Piping Schematic ...
Page 17: ...2 5 Figure 4 Air Cooled Piping Schematic ...
Page 36: ......
Page 40: ......
Page 43: ...6 3 Figure 16 Panel Layout 60 Hz Non CE Machines ...
Page 44: ...6 4 Figure 17 Electrical Schematic Control Circuit All Voltages 50 Hz ...
Page 45: ...6 5 Figure 18 Electrical Schematic Control Circuit All Voltages 60 Hz ...
Page 46: ...6 6 Figure 19 Electrical Schematic 3 Phase Power All Voltages 50 Hz ...
Page 47: ...6 7 Figure 20 Electrical Schematic 3 Phase Power All Voltages 60 Hz ...
Page 68: ......
Page 96: ......
Page 110: ...Notes ...
Page 111: ...Notes ...