22
A
B
C
D
E
F
G
Fig. 7
A
Gas shut-off valve
B
Handle
C
Front panel
D
Gas condensing module ON/OFF switch
E
Export meter
F
Fuel cell ON/OFF switch
G
Serial number of internal electricity meter
Ask your heating contractor about the following:
■
Required system pressure
■
Position of ventilation apertures
1.
Open gas shut-off valve
A
.
2.
Check that the external power supply is switched
on. E.g. on the separate MCB for the micro CHP
system.
Note
Your heating contractor switched on the external
power supply to the micro CHP system during
commissioning. The power supply should generally
not be interrupted (including in standby mode).
3.
Swivel out handle
B
. Pull upper front panel
C
upwards by a small amount.
4.
Turn on first ON/OFF switch
D
and then ON/OFF
switch
F
.
■
After a short time, the standard menu is dis-
played.
■
The light bar is illuminated constantly (pulsing in
standby).
Your micro CHP system and, if installed, your
remote controls are ready for use.
Power generation will start at the earliest possible
time.
5.
Fig. 8
Check the system pressure:
■
Call up the pressure indicator (pressure gauge)
with in
"System overview"
.
■
If the displayed pressure is below 1.0 bar: Top up
the water or notify your heating contractor.
Start-up/shutdown
Starting the micro CHP system
5835784