4.
Check the CO
2
content. Should the
actual value deviate by more than
1% from the above range, imple-
ment the steps from page 15 (pos-
sibly replace the burner).
5.
Enter actual values into the service
report.
6.
Adjust the upper output.
Constant temperature control unit:
&
With
a
/
b
in the display, select
"2".
Weather
–
compensated control unit:
&
With
a
/
b
in the display, select
"Full load".
7.
Check the CO
2
content. Should the
actual value deviate by more than
1% from the above range, imple-
ment the steps from page 15 (pos-
sibly replace the burner).
8.
After testing, press
d
.
9.
Enter actual values into the service
report.
Setting the maximum output
Note
The maximum output can be limited for
heating operation
. You can limit the
output via the modulation range.
1.
Start up the boiler.
Further details regarding the individual steps
(cont.)
16
Initial start-up, inspection, maintenance
5692
569
GB
Summary of Contents for Vitodens 300
Page 111: ...Parts lists cont 111 Parts lists 5692 569 GB...
Page 112: ...Parts lists cont 112 Parts lists 5692 569 GB...
Page 113: ...Parts lists cont 113 Parts lists 5692 569 GB...
Page 114: ...Parts lists cont 114 Parts lists 5692 569 GB...
Page 115: ...Parts lists cont 115 Parts lists 5692 569 GB...
Page 127: ...127 5692 569 GB...