76
Opening the air vent valve for DHW heating
1.
2.
4.
3.
Checking expansion vessel and heating circuit pressure
Observe engineering informa-
tion.
Vitocal technical guide
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5600 950 GB