37
1.
2.
3.
2x
C
Liquid line
D
Hot gas line
!
Please note
No contamination (e.g. metal
swarf) or moisture should enter
the copper pipes.
Therefore, hold the pipe open-
ings downwards or temporarily
plug them.
Note
■ The internal unit refrigerant lines are
filled with nitrogen, overpressure
2 bar.
■ If using Euro flanged adaptors, solder
the connections using shielding gas.
Installation sequence
Connecting refrigerant lines
(cont.)
5600 950 GB
Installation