A
Plug from the pack
B
Distributor (on-site)
C
Cylinder primary pump
D
Two-way valve (normally closed,
tQ
see page 53)
1.
Route the connecting cable of the
cylinder primary pump through the
strain relief at the front of the con-
trol panel.
2.
Connect the cylinder primary pump
cable and the two-way valve, in
accordance with the illustration,
with the 3-pin plug with the contact
designation PE, 7, 8 (in the pack).
3.
Undo the four screws and lift out
the control panel upwards.
4.
Fit the connecting cable in front
position to mating plugs on top-hat
rail marked PE, 7 and 8 (con-
necting area X50).
5.
Re-insert the control panel and
secure with the four screws.
Making the electrical connections of the cylinder . . .
(cont.)
61
Installation sequence
55
92
968
GB
Installation
Summary of Contents for VITOCAL 200-G
Page 8: ...Certificates Declaration of conformity 201 Keyword index 202 Index cont 8 Index 5592 968 GB ...
Page 122: ...Main menu Information Menu structure overview information 122 Control settings 5592 968 GB ...
Page 187: ...Parts lists cont 187 Parts lists 5592 968 GB Service ...
Page 188: ...Parts lists cont 188 Parts lists 5592 968 GB ...
Page 189: ...Parts lists cont 189 Parts lists 5592 968 GB Service ...
Page 206: ...206 5592 968 GB ...
Page 207: ...207 5592 968 GB ...