Checking mixers, heat pump and cylinder heating
Checking the mixer and heat pump
1.
Start the test program:
Menu item
&
"
Device settings
"
&
"
Contractor level
"
&
"
Commissioning
"
&
"
Compressor
"
2.
Start the compressor by pressing
"
ON
".
Note
The compressor will start automati-
cally after expiry of 250 s test.
3.
Check the following temperatures
and record them in the service
report from page 190:
&
The temperature at "
DHW cylin-
der top
" must remain constant
(tolerance: ±1 K).
Otherwise:
–
Check whether the mixer is cor-
rectly adjusted
–
Check the electrical mixer con-
nections (see page 183)
–
Replace the mixer, if required
&
The temperature at "
Secondary
flow
" must rise (observe a rise
up to approx. 30 °C).
Otherwise:
–
Check the primary pump
–
Check the electrical connec-
tions of the components con-
cerned
–
Check the casing temperature
of the heat pump compressor
(see page 111).
&
The spread between the second-
ary flow and the secondary return
must be 6 to 8 K.
Otherwise, match the stage of
the secondary pump to require-
ments.
Checking the cylinder heating by the heat pump
1.
Set the "
Heating/DHW
" mixer for
cylinder heating with key "
100%
" to
"
100%
".
Further details regarding the individual steps
(cont.)
110
Commissioning, inspection, maintenance
55
92
968
GB
Summary of Contents for VITOCAL 200-G
Page 8: ...Certificates Declaration of conformity 201 Keyword index 202 Index cont 8 Index 5592 968 GB ...
Page 122: ...Main menu Information Menu structure overview information 122 Control settings 5592 968 GB ...
Page 187: ...Parts lists cont 187 Parts lists 5592 968 GB Service ...
Page 188: ...Parts lists cont 188 Parts lists 5592 968 GB ...
Page 189: ...Parts lists cont 189 Parts lists 5592 968 GB Service ...
Page 206: ...206 5592 968 GB ...
Page 207: ...207 5592 968 GB ...