PYROMAT DYN45 - DYN85 Issue 1.0
Page 19 of 72
4 Commissioning
General hazard!
Serious injuries due to untrained personnel.
Warning!
1. Only trained and experienced personnel may perform the commissioning of the
heating system.
2. Training personnel may only work on the heating system whilst under supervision.
3. Commissioning work may only be carried out by Köb installation specialists or by
persons authorised by Köb.
L
The commissioning of the complete heating system is carried out by Köb
installation specialists or your installation specialists. The heating system is set up
in such a way that the fuel available, in conjunction with the air intake volume, will
provide an optimum burn.
L
As the operator of a new heating system you are obligated to register this
immediately with the authority responsible for your property. The authority will also
provide you with information regarding further activities pertaining to your heating
system (e.g. regular measurements, cleaning).
L
The instructions for commissioning are contained in the assembly and installation
instructions for specialists.