5
5773 597 - 04
Vitocrossal 200, CM2 400, 500 and 620 Installation
Table of Contents
General Venting Information
......................................34
Installation steps (outline).......................................34
Recommended
venting practice...............................34
Approved
venting
materials.....................................35
Vent termination location requirements
(for installations in Canada).....................................36
Vent termination location requirements
(for installations in the U.S.A.)..................................36
Flashing and storm collar installation...........................37
Additional Requirements for Stainless Steel
Vent Pipe Material
.....................................................37
Exhaust vent/air intake connection to boiler..............37
Requirement for UL/ULC listed Rigid PP
Vent Pipe Material
...................................................38
Requirements for PP and stainless steel....................38
Vent system suppliers............................................38
Vent Requirements
..................................................39
Combustion air supply, room air dependant
application
only.....................................................39
Direct Venting (Two Pipe System)
...............................40
Side
wall vent termination [stainless steel, CPVC or PP]...40
Side Wall Venting
....................................................41
Side wall vent termination [stainless steel or PP]........41
Component Installation Guide
.....................................42
Flashing and storm collar installation........................42
Vent Termination Location Requirements - Vertical
.......42
Installation of Support System - PP
.............................43
Bracing.................................................................43
Vent
system
suppliers............................................43
Long Sweep Elbows
...............................................43
Standard long sweep elbow equivalent length material...43
Two Pipe System-Vertical Exhaust/Vertical Air Intake....
.44
Two Pipe System-Horizontal Exhaust/Horizontal Air Intake....
.44
Two Pipe System-Vertical Exhaust/Horizontal Air Intake.
.45
Two Pipe System-Vertical/Horizontal Installation
s.........45
Single Pipe-Vertical Exhaust / Room Air Dependent
.......46
Single Pipe-Horizontal Exhaust / Room Air Dependent
.......46
Single Pipe System-Vertical/Horizontal Installation
s.......47
Maximum allowable equivalent length -
stainless steel / PP.................................................47
Multiple Boiler Installations
.........................................47
Horizontal vent termination.....................................47
Vertical vent termination.........................................47
Venting
Venting Options - Stainless Steel/PP
Page