28
5773 597 - 04
Vitocrossal 200, CM2 400, 500 and 620 Installation
Top Panels
1. Secure the front edge of central top panel
A
to the
tie-bar with two 4.8 mm screws and secure the back
of the panel to the LH and RH top rails with one
4.8 mm screw each.
2. Secure cover
B
to the tie-bar with two 4.8 mm
screws.
3. Secure front top panel
C
to the front side panels
with two M6 screws.
4. Position LH rear top panel
D
. Then position RH
rear top panel
E
. Where they overlap in the middle,
secure both rear top panels to the central top panel
with one 4.8 mm x 38 mm screw.
5. Secure RH rear top panel
E
and LH rear top panel
D
to the back panel with one 4.8 mm screw each.
Front Panels
1. Attach four clips E (included with the fixings) to the
bottom front panel.
2. Hook bottom front panel
C
into the front side
panels.
3. Screw two profile studs
B
into top front panel
D
.
4. Position top front panel
D
onto bottom front panel
C
.
5. Fit top front panel
D
so that the profile studs
B
at the top lock into the side panels. Secure with a
M5
screw.
6. Affix type plate
A
to a side panel on the accessible
side.
Top Panels
Boiler