14
Hydraulic installation scheme
22
27
1
15 6
4
2
--KM BUS--
--X3.8;3.9--
--230V
--
P1
P1
7
20
21
--2/X3.8;3.9--
P
Note
Type BWC 301.A is shown. The circulation pumps are installed and connected at the
factory (primary pump
qT
, secondary pump
6
, circulation pump for cylinder heating
7
, instantaneous heating water heater
4
optional).
In type BW 301.A, no circulation pumps are installed at the factory. For the connection
of primary pump
qT
, see "Primary circuit, type BW 301.A + BWS 301" (page 19).
Preparing for installation
Primary circuit, type BW 301.A, BWC 301.A (brine/water)
5600 161 GB
Summary of Contents for BW 01.A06
Page 121: ...121 Opening the shield Troubleshooting Repairs cont 5600 161 GB Service ...
Page 166: ...166 5600 161 GB ...
Page 167: ...167 5600 161 GB ...