19
With two primary pumps
Hydraulic installation scheme
22
27
9
20
21
--2/X3.8;3.9--
1
2
--KM BUS--
--X3.8;3.9--
--230V
--
P1
P1
P1
P1
--F2--
16
--2/224.2--
--2/211.1--
--F3--
17
--F2--
--21
1.1--
--F3--
--224.2--
25
15
P
Preparing for installation
Primary circuit, type BW 301.A + BWS 301.A (two-stage, brine/water)
5600 161 GB
Installation
Summary of Contents for BW 01.A06
Page 121: ...121 Opening the shield Troubleshooting Repairs cont 5600 161 GB Service ...
Page 166: ...166 5600 161 GB ...
Page 167: ...167 5600 161 GB ...