48
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
..................................................................................................... 49
•
2. Compiling reports
.............................................................................................................. 49
•
3. Purging the refrigerant lines and the internal unit
.......................................................... 49
•
4. Checking tightness of the refrigerant lines
..................................................................... 49
•
5. Evacuating the refrigerant lines and internal unit
........................................................... 50
•
6. Charging the refrigerant lines and internal unit
.............................................................. 51
•
•
•
7. Checking the refrigerant circuit for tightness
................................................................. 52
•
8. Filling and venting the secondary side
............................................................................ 52
•
9. Filling and venting the solar circuit
.................................................................................. 53
•
•
•
10. Checking expansion vessel and heating circuit pressure
............................................. 54
•
11. Cleaning the DHW cylinder
............................................................................................... 54
•
12. Measuring the anode earth current with an anode tester
.............................................. 55
•
13. Checking the magnesium anode
...................................................................................... 55
•
14. Replacing the magnesium anode
..................................................................................... 55
•
•
15. Checking electrical connections of the internal unit for firm seating
•
•
•
16. Checking the free running of the fan in the external unit
............................................... 55
•
17. Cleaning the external unit heat exchanger (evaporator)
................................................ 56
•
18. Checking thermal insulation of flared connections
•
•
19. Checking electrical connections of the external unit for firm seating
.......................... 56
•
•
•
20. Closing the heat pump
....................................................................................................... 56
•
•
•
21. Switch ON the power
......................................................................................................... 56
•
•
•
22. Starting the heat pump
...................................................................................................... 57
•
23. Commissioning the system
............................................................................................... 57
•
24. Ticking the heat pump type
............................................................................................... 63
•
•
•
25. Checking the heat pump for noise
................................................................................... 63
•
•
•
26. Checking the system function
.......................................................................................... 64
•
27. Instructing the system user
.............................................................................................. 64
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance