Connections
n
Magnet valve coils at the bottom, depending on length
n
Floating switch bottom right side
n
Flow switch centre right side
Shut the water off.
De-energise the flush valve.
Disconnect the plug from the control.
Disconnect and remove the connection line of the flow switch.
Unscrew the union nut of the flow switch (at the side of the T-piece).
Replace the flow switch.
Re-assemble the components in reverse order. Note the tightening
torque of the union nut of the flow switch (plastic): max. 8 Nm.
Shut the water off.
De-energise the flush valve.
Disconnect the plug from the control.
Disconnect and pull off the connection line of the floating switch.
Use a 10 mm fork spanner to unscrew the four nuts.
Replace the siphon.
Re-assemble the components in reverse order.
Shut the water off.
De-energise the flush valve.
Disconnect the plug from the control.
Disconnect and pull off the connection lines of the magnet valve
coils (4 pcs.).
CAUTION! Risk of burning due to hot magnetic coils! After
prolonged water exchange, the magnet coils get hot. Do not
touch them.
Unscrew the union nut of the magnet valve (SW 30).
Unscrew the 2 Allen screws (3 mm).
Replace the magnet valve.
Use a new seal.
Re-assemble the components in reverse order. Note the tightening
torque of the union nut: max. 8 Nm.
Replacing the flow switch
Replacing the siphon
Replacing the magnet valve
Handling
Flush valve universal
61 from 62