background image

 

 

21

Conversion of already installed boiler: 

 

We let the boiler burn out. 

 

We disconnect the boiler from mains  

 

We disconnect the geared motor, ventilator (we disconnect the connector), boiler primary pump, safety 
thermostat from regulator and we pull out the sensor against fire penetration from the basin and outlet 
sensor from the boiler basin, we disconnect the outside sensor and QAA 88 device. Depending on the 
used  pump  or  mixing  heating  circuit  we  disconnect  the  HW  sensor  with  three-way  valve  or  thermostat 
with HW pump, HC pump with mixing valve and heating circuit sensor. 

 

We disconnect the emergency fire extinguishing equipment. 

 

First of all we empty the reservoir. We dismantle the fuel reservoir from the fuel feeder (the connection 
accessories are as follows: 4 pc screw M8 x 20, 4 pc washer 8,4 and 4 pc nut M8).  

 

We  disconnect  the  fuel  feeder  from  the  boiler  basement  (the  connection  accessories  are  as  
follows: 4 pc screw M10 x 20, 4 pc washer 10,5). 

 

1. 

Service board  

2. 

Nut M6 (4 pcs) 

3. 

Washer 6,4 (4 pcs) 

4. 

Screw M6 x 16 (4 pcs) 

5. 

Fuel reservoir 

6. 

Nut M8 (4 pcs) 

7. 

Washer 8,4 (8 pcs) 

8. 

Screw M8 x 20 (4 pcs) 

9. 

Fuel feeder 

10.  Screw M10 x 20 (4 pcs) 
11.  Washer 10,5 (4 pcs) 
12.  Stud bolt M10 x 30 (4 pcs) 

Fig. no. 16 

Boiler conversion from the right-hand to left-hand design- fuel reservoir and feeder 

disconnection  

Summary of Contents for EKORET SAPHIR 15

Page 1: ...Hercules U26 N vod k obsluze EKORET SAPHIR MANUAL FOR BOILER OPERATION AND INSTALLATION...

Page 2: ...ting of parameters before the equipment start up 29 5 5 Boiler commissioning 30 5 6 HMI ACX84 910 ALG service unit for Saphir regulator operation 31 5 7 Superior control 31 6 Boiler operation by user...

Page 3: ...gh efficiency 2 Boiler technical data Tab no 1 Boiler dimensions technical parameters EKORET SAPHIR 15 3 sect EKORET SAPHIR 25 4 sect Boiler weight including small reservoir kg 359 385 Boiler weight i...

Page 4: ...ve mentioned heating technical parameters vary according to the type quality and moisture of the fuel used Therefore there may be necessary corrections at setting of feeding time proportion of fuel fe...

Page 5: ...pecified pellets granularity between 6 and 8 mm Maximum fuel water content 12 Ash content max 1 5 WARNING A poor quality of fuel can markedly negatively affect the boiler output and emission parameter...

Page 6: ...dapter 4 Ash door 5 Ash door 6 Arc 7 Ceramic plate front 8 Ceramic plate rear 9 Ceramic plate side 10 Boiler shell incl ash pan 11 Safety thermostat 12 Turbulators 13 Heating water flange 14 Return wa...

Page 7: ...e screw conveyor equipment The combustion air fan is placed in front of the fuel reservoir and is connected to the burner The heating water inlet and outlet is placed in the back part of boiler and it...

Page 8: ...rs with colours or digits Implementing regulations SN 33 1500 Electrical regulations Electrical equipments revision SN 33 2000 3 Electrical regulations Electrical equipments Part 3 Setting the basic c...

Page 9: ...reaction to fire has not been proved Tab no 5 Grade of reaction to fire Grade of reaction to fire Examples of building materials and products included in the reaction to fire Extract from EN 13 501 1...

Page 10: ...at where the boiler is installed It must be ensured the continuous air supply into the room where the boiler is installed for burning and eventual ventilation the air consumption of EKORET SAPHIR boil...

Page 11: ...tral from old boiler binding material This way ready pedestral place in the boiler room Apply binding material on the boiler pedestral and placet the boiler body Tightness of the pedestral with boiler...

Page 12: ...circuit Legend to Fig no 7 and 8 A6 QAA 88 device BT1 Safety thermostat B2 Boiler outlet temperature sensor B3 HW temperature sensor B5 Fuel feeder temperature sensor B9 Outside temperature sensor EX...

Page 13: ...ostat BT3 Thermostat HW B1 Heating branch temperature sensor B2 Boiler outlet temperature sensor B5 Fuel feeder temperature sensor B9 Outside temperature sensor EX Expansion vessel M1 Fuel feeder moto...

Page 14: ...At this type of operation HMI ACX84 910 ALG service unit displays the word Wood Three way mixing valve must open up to maximum into the heating circuit Floor heating Floor heating can be used in mixi...

Page 15: ...the safety thermostat signalization Boiler operation and installation manual a guarantee list is its part List of contract service organization Thermostatic valve TS 130 STS 20 1 pc Obligatory accesso...

Page 16: ...ix the bushing PG 13 5 according to connection and screw be means of 4 pcs of screws M5 x 25 and 4 pcs washer 5 3 to stand 4 Mount the spring clamps into the front shell and insert the insulation Fix...

Page 17: ...ng spindle 4 pcs 7 Spring clamp 4 pcs 8 Washer 5 3 4 pcs 9 Screw M5x25 4 pcs 10 Front part of shell 11 Insulation of shell front part 12 Cover of the shell 13 Cover of the shell insulation 14 Back par...

Page 18: ...nd fuel reservoir to the fuel feeder position everything horizontally and afterwards provide a final drawing up the screws and nuts 1 Apply binding material on the boiler pedestral afterwards assembly...

Page 19: ...TS 130 STS 20 valve interconnection The interconnection is to be carried out by means of a flexible stainless hose It must regard a detachable connection of the valve with a pipe in the cover of the...

Page 20: ...The blind flange with basement must be sealed with mastic We apply mastic to the burner with mixer flange and we put the burner into the basement from the left hand side and screw it the connection a...

Page 21: ...and heating circuit sensor We disconnect the emergency fire extinguishing equipment First of all we empty the reservoir We dismantle the fuel reservoir from the fuel feeder the connection accessories...

Page 22: ...th mastic Fig no 17 Boiler conversion from the right hand to left hand design dismantling of burner and blind flange We apply mastic to the burner with mixer flange and we put the burner into the base...

Page 23: ...r the connection accessories are as follows 4 pc screw M8 x 20 4 pc washer 8 4 and 4 pc nut M8 We connect the emergency fire extinguishing equipment We connect the service board incl consoles to the f...

Page 24: ...hermal protection BT1 Safety thermostat H1 Safety thermostat signalling K1 Fuel feeder motor relay K3 K4 Technological relays M1 Fuel feeder motor M2 Air fan motor X10 Ventilator socket X10 1 Ventilat...

Page 25: ...REGULATION M1 FUEL FEEDER Q1 BOILER PUMP Y3 HW THREE WAY VALVE B3 HW TEMPERATURE B2 BOILER OUTLET TEMPERATURE B5 FUEL FEEDER TEMPERATURE B9 OUTSIDE TEMPERATURE A6 ROOM DEVICE TB MOTOR THERMAL PROTECT...

Page 26: ...thermostat H1 Safety thermostat signalling K1 Fuel feeder motor relay K2 Heating branch pump relay K3 K4 Technological relays M1 Fuel feeder motor M2 Air fan motor X10 Air fan motor socket X10 1 Venti...

Page 27: ...y WHITE White YELOW Yellow RED Red BT1 SAFETY THERMOSTAT M2 VENTILATOR SUPPLY M2 PWM VENTILATOR SPEED REGULATION M1 FUEL FEEDER Y1 MIXING VALVE Q1 BOILER PUMP Q2 HEATING CIRCUIT PUMP Q3 HW CHARGING PU...

Page 28: ...oxygen which increases the corrosive effects and at the same time lot of water evaporates Only the water treated to the values according to SN 07 7401 can be used for refilling The heating system mus...

Page 29: ...ameters before the equipment start up Parameters necessary for equipment start up Before you make a fire you must set following parameters Parameter Description Units Set by the manufacturer P 20 Fuel...

Page 30: ...r the fuel flaring can be checked As necessary the ventilator can be switched off by pressing the blue button and if it be to the contrary the ventilator is automatically switched off after 15 minutes...

Page 31: ...the line P 24 of device QAA 88 select the value 2 On the operating unit HMI the superior control shall be activated in Menu Boiler Type of Requirement by selecting the function RVS In the Menu Boiler...

Page 32: ...the requirement for heat has ceased the boiler goes over to the attenuation regime The minimum boiler temperature is kept in the attenuation regime Boiler pump the pump is switched on when 55 C has be...

Page 33: ...ve the regulator safety functions the boiler shouldn t be disconnected from mains In case of boiler disconnection from mains time in regulator might stop and consequently the time regimes will switch...

Page 34: ...evice space unit Space control Outside sensorQAC34 101 is not used Thermostatic valve Filling valve series VTC312 external thread from ESBE minimum return water temperature 45 o C ord code 5100 15 00...

Page 35: ...utside sensor QAC34 101 Thermostatic valve Filling valve series VTC312 external thread from ESBE minimum return water temperature 45 o C ord code 5100 15 00 Three way mixing valve VBI31 20 with drive...

Page 36: ...erature in the space The parallel shift parameter shifts the whole heating curve The heating curve slope parameter only changes the slope of the curve 6 1 2 Safety thermostat The safety thermostat is...

Page 37: ...ircuit Parameter Description Units Set by the manufacturer Range Resolution P 1 Current outside temperature o C 20 50 0 1 P 2 Current boiler temperature o C 5 100 0 1 P 3 Current heating circuit tempe...

Page 38: ...30 0 1 P 110 Time schedule reset HC 0 0 1 1 P 111 Desired space temperature in attenuation o C 19 5 25 0 1 P 120 Setting the day of time schedule for HW 1 0 7 1 P 121 First period HW switched on h mi...

Page 39: ...gime hard coal s 90 5 200 1 P 209 Ventilator output in the attenuation hard coal 50 10 100 1 P 210 Feeder X1 pellets 0 0 0 P 211 Feeder Y1 pellets 3 sect 4 sect s 32 56 22 42 46 66 1 P 212 Feeder X2 p...

Page 40: ...three way valve slowing down min 3 0 10 1 P 70 Outside temperature reset 0 0 1 1 P 71 Space hysteresis o C 0 5 0 1 5 0 1 P 72 Space effect 20 0 100 1 P 76 Minimum heating circuit temperature o C 30 2...

Page 41: ...l 3 sect 4 sect s 120 105 70 150 60 150 1 P 172 Feeder X2 hard coal 33 33 0 P 173 Feeder Y2 hard coal 3 sect 4 sect s 85 58 50 120 40 110 1 P 174 Feeder X3 hard coal 66 66 0 P 175 Feeder Y3 hard coal...

Page 42: ...it temperature o C Current desired heating circuit temperature displayed P 5 Current temperature HW o C Current HW temperature displayed P 6 Desired boiler temperature in case of HW heating o C Curren...

Page 43: ...he value set in this parameter P 26 Maximum feeder temperature o C Setting of feeder maximum temperature Once this temperature has been reached on the fuel feeder sensor the feeder starts to move fuel...

Page 44: ...oiler primary pump switch on temperature o C Once this set boiler temperature has been achieved the boiler primary pump will switch on The pump will switch off once the temperature has dropped by 5 C...

Page 45: ...three way valve slowing down min Over this set period HW three way valve is kept open into HW circuit when the desired HW temperature has been reached If the boiler temperature after the HW preparatio...

Page 46: ...tus image Value 0 winter the function is not active it means heating isn t blocked Value 1 summer the function is active it means heating is blocked P 86 Heating system Setting the type of heating bod...

Page 47: ...iod HW switched on h min Setting the time of switching on the first period for HW heating Note It isn t necessary to use the second and third period P 122 First period HW switched off h min Setting th...

Page 48: ...standstill time for HU fuel relating to 100 output P 158 Feeder runtime in the attenuation lignite s Setting the feeder runtime in the attenuation regime for HU fuel P 159 Standstill time delay of fee...

Page 49: ...The value 100 represents 100 output and feeder standstill time of parameter 177 is assigned to this value Note This parameter cannot be changed P 177 Feeder Y4 hard coal s Setting the feeder standstil...

Page 50: ...hanged P 215 Feeder Y3 pellets s Setting the feeder standstill time for pellets as the fuel relating to 66 output P 216 Feeder X4 pellets It regards the percentage value of output Value 100 represents...

Page 51: ...in the attenuation regime P 231 Superior control regulation Value 0 is not the current requirement from the superior control Value 1 is the current requirement from the superior control P 232 Outside...

Page 52: ...o Fig no 26 QAA 88 device Then the cursor moves according to the boiler current status Small ventilator symbol represents 0 33 ventilator output the middle sized ventilator symbol represents 33 66 ven...

Page 53: ...on After the completion of making changes in parameters always check whether QAA 88 device is switched on cursor is above the Auto symbol Parameters displaying If you only want to display the set para...

Page 54: ...40 50 60 70 80 25 30 35 40 45 50 55 Skute n v kon ventil toru Prodleva podava e paliva s 0 20 40 60 80 100 120 V kon ventil toru V konov k ivka podava e paliva z vislost podava e paliva na skute n m v...

Page 55: ...0 120 15 20 25 30 35 40 45 50 55 Skute n v kon ventil toru Prodleva podava e paliva s 0 20 40 60 80 100 120 V kon ventil toru V konov k ivka podava e paliva z vislost podava e paliva na skute n m v ko...

Page 56: ...30 40 50 60 5 10 15 20 25 30 35 40 45 Skute n v kon ventil toru Prodleva podava e paliva s 0 20 40 60 80 100 120 V kon ventil toru V konov k ivka podava e paliva z vislost podava e paliva na skute n m...

Page 57: ...iler temperature the boiler might be shut down through the safety thermostat set to approx 100 C This fault is non reversible and it is necessary to de block the safety thermostat after the boiler has...

Page 58: ...hut down 14 B9 Outside temperature Boiler operation to the fixed temperature 15 A6 Room device Boiler heats to the latest desired temperature 6 4 Service board 1 Circuit breaker circuit breaker B16 1P...

Page 59: ...e There is a danger of an injury caused by rotating worm shaft It is forbidden to use the flammable liquids for firing the boiler The flame is to be observed by opening the upper door ajar But you mus...

Page 60: ...llowed by not using the suitable protective equipments 6 If the pieces of stone metal or wood occur in the fuel the feeding screw it can get blocked If this situation happens and the engine is overhea...

Page 61: ...of EKORET SAPHIR boiler serfes after its filling as a Guarantee certificate A regular boiler maintenance according to chap 8 must be done by its user In case of non performance of mentioned instructio...

Page 62: ...unit EN 13429 2000 NO 3 1 Recovery by material recycling ensure recyclability in all term sof the standard for the functional packaging unit EN 13430 2000 YES 3 2 Recovery in the form of energy ensure...

Page 63: ...on and installation manual will be carried by a contracting service organization The completeness including the standard accessories and the output adjustment according to the Operation and installati...

Page 64: ...certificate for customer the user Record of accomplished guarantee and post guarantee repairs and regular product checks Record date Carried out activity Contracting service organization stamp signat...

Page 65: ...peration and installation manual will be carried by a contracting service organization The completeness including the standard accessories and the output adjustment according to the Operation and inst...

Page 66: ...66...

Page 67: ...ration and installation manual will be carried by a contracting service organization The completeness including the standard accessories and the output adjustment according to the Operation and instal...

Page 68: ...68 Update 42 2012 GB...

Reviews: