
45
Copyright © Veryx Technologies Pvt. Ltd
.
Performance Tests
10.
After you have configured the parameters, from the Network Configuration
pane select the switch group network for running the test and click
to execute the test.
For
Throughput,
Latency and Robustness
tests, the minimum number of switches for the
Incremental Mode
test must be 4. For more details about the different tests that can be
executed, refer to
Chapter 7
,
Chapter 8
and
Chapter 9.