![Vertiv NetSure HVT F02 CK1 User Manual Download Page 20](http://html1.mh-extra.com/html/vertiv/netsure-hvt-f02-ck1/netsure-hvt-f02-ck1_user-manual_1008116020.webp)
Vertiv™ NetSure™ HVT F02 CK1 Power System User Manual
12
4. Remove the AC output MCB panel from the AC distribution cabinet, and connect one end of the AC cable to the AC output
terminal of the selected MCB in the AC distribution cabinet, as shown in Figure 1.12.
Figure 1.12
Connection of AC input cables of rectifier cabinet in AC distribution cabinet (left view)
NOTE!
Regardless of whether the output MCB is installed to the left or right, the phase sequence is wired in the order of
A, B and C from top to bottom.