Vertiv™ NetSure™ HVT F02 CK1 Power System User Manual
5
Steps:
1. Mark the installation position.
2. Determine the installation position of the power cabinet in the machine room according to the installation drawing.
3. Based on the mechanical dimensions (see Figure 1.4) of the installation holes of the power cabinet, determine the exact
position of the center points of the installation holes on the floor, and mark them with a pencil or oil pen.
4. Use electric drill to drill holes at the center points of the installation holes marked on the floor, and then use the expansion bolts
(accessories) to fasten the cabinet.
Figure 1.4
Installation dimensions of the cabinet base (unit: mm)
When the cabinet bottom plate is optional, part of the bottom plate of the DC cabinet needs to be installed on site. The specific
installation steps are as follows:
1. The DC cabinet has a bottom plate that is fixed at the rear bottom of the cabinet before delivery, as shown in Figure 1.5. Remove
the four fixing screws of the bottom plate on site, and then take off the bottom plate.
Figure 1.5 Removing the bottom plate
Fixing screw of
bottom plate (2pcs
for both left and
right side)
Bottom plate to
be removed
Installation position
of bottom plate
Rear view
2. Install the removed bottom plate to the position shown in Figure 1.6 and tighten the four fixing screws of the bottom plate.