Vertiv™ NetSure™ HVT F02 CK1 Power System User Manual
3
NOTE!
Generally, in design the total current passing through the lead is calculated based on full load configuration.
Preparing other materials
1. Purchase materials according to the construction materials list and inspect the materials. For example, check the heat durability,
moisture resistance, flame resistance, and pressure resistance of the cables.
2. For the materials that need to be processed by other factories, the materials and the processing drawings should be provided
in advance for processing.
3. The auxiliary materials for power supply installation include expansion bolts, cable lugs, cable ties, and insulating tape.
1.2
Unpacking Inspection
The equipment should be unpacked and inspected after it arrives at the installation site. The inspection shall be done by
representatives of both the user and Vertiv Tech Co., Ltd.
To inspect the equipment, you should open the packing case, take out the packing list and check against the packing list that the
equipment is correct and complete. Make sure that the equipment is delivered intact.
Steps:
1. Open the packing case in which the packing list is put.
2. Take out the packing list.
3. Check the goods one by one according to the packing label.
4. Check the number and serial number of the packing cases.
5. Check the correctness of the equipment packing.
6. Check the number and type of the accessories.
7. Check the completeness of the equipment configuration.
1.3
Mechanical Installation
1.3.1
Cabinet Layout
Placing AC distribution cabinets, rectifier cabinets and DC distribution cabinets in different ways will directly affect the
configuration and installation of the system parallel components, thus the user should firstly determine the layout of each cabinet
of the system before installation and connection of the power system.
When the power system is placed in a standard configuration, the layout of the power system is shown in Figure 1.1.
Figure 1.1
Layout of rectifier cabinets and DC distribution cabinets