Vertiv
|
NetSure 502NGFB Installation Manual (Section 6009)
|
Rev. Z
22
GMT Load Distribution Fuses (List BA, NA, BC, LC and NC)
Procedure
NOTE!
1.
Open the Distribution Unit’s front access panel.
2.
Install correctly sized GMT fuses into the fuse holders located inside the Distribution Unit, as required. If
a dummy fuse is installed, first remove the dummy fuse. Install a safety fuse cover over each GMT fuse.
3.
When finished, close the Distribution Unit’s front access panel.
Figure 7:
Installing GMT Load Distribution Fuses (List BA, NA, BC, LC and NC)
GMT Fuse
Positions
Max. 10A
Front
GMT
Fuses