Vertical SUMMIT IP
Hardware Description and Installation Manual
Issue 1.2
3
1.2 About This Manual
This document provides general information covering the description and installation of the
Vertical SUMMIT IP System hardware. While every effort has been taken to ensure the
accuracy of this information, Ericsson-LG Enterprise makes no warranty of accuracy or
interpretations thereof.
The document is divided into ten (10) sections as described in the following. A glossary of
telephony terms and abbreviations is provided in Appendix A.
Section 1
Introduction
This section introduces important safety information and the manual.
Section 2
System Overview
Provides general information on the Vertical SUMMIT IP System, including the system
specifications and capacity.
Section 3
Installation Overview
Describes detailed instructions for planning the installation site and procedures to install
the Vertical SUMMIT IP System.
Section 4
Board Installation & Description
Provides a description and instructions for installing components of the Vertical SUMMIT IP.
Section 5
Mounting the KSU and EKSU
Provides instructions for mounting the KSU and EKSU.
Section 6
KSU and EKSU Wiring
Provides instructions on wiring the KSU and EKSU including Modular jacks for Lines,
stations, LAN ports, and Miscellaneous connections as well as Earth Grounding and
Battery Backup.
Section 7
Terminal Connections and Wiring
Describes the various terminals, maximum wiring distance, and other device connections
for the terminals.
Section 8
Starting the Vertical SUMMIT IP System
This section provides general information for starting the System, assigning the Nation
code, and running the Installation Wizard.
Section 9
Maintenance & Troubleshooting
Provides information on maintenance the Vertical SUMMIT IP System, replacing the PSU
fuse and deals with common troubleshooting issues.
Section 10 Open Source Software Notice
Provides information on open source software and General Public Licenses.