Vertical SUMMIT IP
Hardware Description and Installation Manual
Issue 1.2
19
4.3 Installation of Option Boards
Prior to installing any option board, assure power is OFF. We recommend wearing a wrist-
strap connected to a known ground. At a minimum, before touching any board discharge any
built-up static charge by touching a grounded object.
To install a board, perform the following Steps as depicted in Figure 4.4 below:
1. Remove the KSU and Cord cover as detailed in section 4.2.
2. For an Interface board, remove the modular jack cover plate as shown in #1.
3. If the board is provided with standoffs, remove two screws holding the MBU in the
locations indicated in the figure.
4. Insert 2 standoffs through the MBU and into the cabinet. Tighten the standoffs with
Wrench as shown in #2.
5. Holding the board as shown in #3, insert the board carefully in the direction of the
arrow.
6. Carefully align the connector on the board with the mating MBU connector pins, then
push the board down to fully engage the connectors.
7. To securely fix the board in place, insert and tighten 2 screws as shown in #5.
Figure 4.2 Board Installation