Marquee ACON Ultra Installation/Operation Guide
D-3
11. Remove the support bar and set it
aside.
12.
To replace the frame grabber PCB in slot number 1:
13. Locate the ribbon cable from the
second PCB to the first PCB.
Disconnect the cable from the first
PCB.
14. Remove 1 screw from the PCB.
15. Carefully remove the frame grabber
PCB from the first slot.
Summary of Contents for MARQUEE ACON Ultra Camera Kit
Page 2: ...VDCDS Doc 79024 01 Revision 2 0 2 07 30 2007 MARQUEE ACON Ultra Operation Maintenance Manual ...
Page 3: ......
Page 4: ......
Page 5: ......
Page 19: ......
Page 31: ...Marquee ACON Ultra Installation Operation Guide 2 8 AU User Controls Settings and Operation ...
Page 67: ......
Page 75: ......