PaX-i
(PCH-2500) Installation Manual
68
4 Installing the Equipment: Floor Standing (Optional)
3.
Secure them loosely using 4 wrench bolts
(Part No.22). Do not tighten them fully yet.
Wrench
bolts
M8 x 20
Part No.22
Qty: 4
Allen
wrench
6 mm/0.24”
Be careful not to scratch the surface while
tightening the bolts.
If necessary, one installer should try to level
the CEPH unit with the column unit to facilitate
screwing them.
4.
Remove the EPS, starting with the lower one.
Raise the column up a little bit with the UP/
DOWN switch to make it easy to remove EPS
5.
If the equipment turned ON, now turn it OFF.
Summary of Contents for Pax-i PCH-2500
Page 1: ...Installation Manual Full version Model PCH 2500 Version 3 06 English...
Page 2: ......
Page 3: ......
Page 46: ...This page is intentionally left blank...
Page 82: ...This page is intentionally left blank...
Page 104: ...This page is intentionally left blank...
Page 124: ...This page is intentionally left blank...
Page 166: ...This page is intentionally left blank...
Page 167: ...Acquiring the Test Image 10...
Page 169: ...11 Technical Specifications...
Page 176: ...This page is intentionally left blank...
Page 179: ...PaX i PCH 2500 Installation Manual 179 Appendix Schematic diagram Components supplied...
Page 183: ...PaX i PCH 2500 Installation Manual 183 Appendix 2 3M 2 2M 2 1M 2 0M 4 Separate the side cover...
Page 199: ......
Page 200: ...Postal code 18449 13 Samsung 1 ro 1 gil Hwaseong si Gyeonggi do Korea www vatech co kr...