PaX-i
(PCH-2500) Installation Manual
184
Appendix
Determining the height
1. Determine the screw height using the following formula.
h
screw height
=
H
ceiling
-d
, where d is the distance between the ceiling and the top of the equipment when the column is fully
extended (at least 30 cm (12”) is desired).
Ex): Let d=30 cm,
H
ceiling
=250 cm (99”), then
h
screw height
=H
ceiling
-d=250-30=220 cm, which means that the
screw should be installed at this height.
H
ceiling
GุFPರ
Summary of Contents for Pax-i PCH-2500
Page 1: ...Installation Manual Full version Model PCH 2500 Version 3 06 English...
Page 2: ......
Page 3: ......
Page 46: ...This page is intentionally left blank...
Page 82: ...This page is intentionally left blank...
Page 104: ...This page is intentionally left blank...
Page 124: ...This page is intentionally left blank...
Page 166: ...This page is intentionally left blank...
Page 167: ...Acquiring the Test Image 10...
Page 169: ...11 Technical Specifications...
Page 176: ...This page is intentionally left blank...
Page 179: ...PaX i PCH 2500 Installation Manual 179 Appendix Schematic diagram Components supplied...
Page 183: ...PaX i PCH 2500 Installation Manual 183 Appendix 2 3M 2 2M 2 1M 2 0M 4 Separate the side cover...
Page 199: ......
Page 200: ...Postal code 18449 13 Samsung 1 ro 1 gil Hwaseong si Gyeonggi do Korea www vatech co kr...