PaX-i
(PCH-2500) Installation Manual
79
4 Installing the Equipment: Floor Standing (Optional)
4.7 Leveling the Equipment
Ensure that the spirit level should rest only on the locations indicated in
the∙following∙figures∙to∙obtain∙the∙accurate∙center.
1.
Prepare the spirit level.
X-ray tube head
Rotating
Unit
2.
Turn the Rotating Unit manually until the
X-ray tube head points forward as shown in
the figure.
3.
Turn the Level Foot on the Base Unit
clockwise with the wrench until the equipment
touches the ground as shown in the
illustration.
Allen
wrench
Summary of Contents for Pax-i PCH-2500
Page 1: ...Installation Manual Full version Model PCH 2500 Version 3 06 English...
Page 2: ......
Page 3: ......
Page 46: ...This page is intentionally left blank...
Page 82: ...This page is intentionally left blank...
Page 104: ...This page is intentionally left blank...
Page 124: ...This page is intentionally left blank...
Page 166: ...This page is intentionally left blank...
Page 167: ...Acquiring the Test Image 10...
Page 169: ...11 Technical Specifications...
Page 176: ...This page is intentionally left blank...
Page 179: ...PaX i PCH 2500 Installation Manual 179 Appendix Schematic diagram Components supplied...
Page 183: ...PaX i PCH 2500 Installation Manual 183 Appendix 2 3M 2 2M 2 1M 2 0M 4 Separate the side cover...
Page 199: ......
Page 200: ...Postal code 18449 13 Samsung 1 ro 1 gil Hwaseong si Gyeonggi do Korea www vatech co kr...