Before attempting installation, review the Safety Precautions below. Installation and
maintenance personnel should become familiar with any hazards present as well as any agency
requirements before working with any equipment.
7.1
General Safety Guidelines
The user should follow safety guidelines provided by the Occupational Safety and Health
Administration (OSHA) for additional protection. Information may be obtained from the
following sources:
•
National Electric Code (NEC)
•
National Fire Protection Association (NFPA)
•
Instrument Society of America (ISA)
•
Factory Mutual Research Corporation (FM)
•
Underwriters’ Laboratories Incorporated (UL)
•
Canadian Standards Association (CSA)
When in doubt about the safety of an area, the user should check with the local safety
authorities. Always observe warning signs posted in the area and all labels on equipment.
7.2
Installation Safety Guidelines
•
Never attempt to make voltage measurements within the Tank Gate Interface in the field.
•
Maintenance should be performed only by authorized personnel.
•
Always turn off the power before removing the case cover.
•
Before installing/repairing any wiring to the Tank Gate Interface, make sure that the power
is turned off at the main circuit breaker or switch. The power switch should be locked in the
OFF position and labeled to prevent other personnel from turning the power on during
installation.
•
Before turning on power when installation is complete, make sure the cover of the Tank
Gate Interface case is in place and tightly closed. NEVER REMOVE ANY COVERS WITHOUT
FIRST TURNING OFF THE POWER.
•
To prevent shock hazards, the housing of all units should be properly grounded in
accordance with the National Electric Code. A grounding conductor should be wired to the
grounding terminal provided on the Tank Gate Interface.
•
In some applications, a substantial amount of heat is produced by other equipment inside
or outside the enclosure. To assist in air circulation, place blower fans inside the enclosure.
•
To prevent excessive heat, several steps can be taken. For most applications, normal
convection cooling will keep the device components in the enclosure within the operating
range. Proper spacing of components within the enclosure is usually sufficient for heat
dissipation.
•
Caution should be exercised when entering any area that is posted or otherwise assumed to
contain hazardous gases. Always follow the guidelines provided by the Occupational Safety
and Health Administration for your own protection.
Caution! Do not bring in unfiltered outside air. It may introduce harmful contaminants that
could damage the Tank Gate Interface and components.
Caution! Never perform maintenance with power applied.
Summary of Contents for 8300 series
Page 2: ......
Page 6: ...Tank Gate Interface iv Installation and Operations Manual ...
Page 14: ...Overview Tank Gate Interface 4 Installation and Operations Manual ...
Page 50: ...Software Description Tank Gate Interface 40 Installation and Operations Manual ...
Page 52: ...Dual RS 485 MODBUS Software Blocks Tank Gate Interface 42 Installation and Operations Manual ...
Page 56: ...Tank Gate Interface 46 Installation and Operations Manual ...
Page 68: ...Tank Gate Interface 58 Installation and Operations Manual ...
Page 100: ...Tank Gate Interface 90 Installation and Operations Manual ...
Page 112: ...Tank Gate Interface 102 Installation and Operations Manual ...
Page 115: ...8303 Installation Varec Inc 105 s Figure 7 2 Tank Gate Interface Dimensions 197 204 125 ...
Page 148: ...Appendix Order Codes Tank Gate Interface 138 Installation and Operations Manual ...
Page 149: ......