
7. Install the inner baffle (
G
) with raised edges (
J
) facing
OUT.
NOTE:
DO NOT forcibly install components. One corner of
the breather components have a sharper radius than the
others to ensure correct alignment.
8. Install the reed valve assembly (
E
) into the valve cover
(
H
) with the reed valve facing out.
9. Install O-ring (
F
) into valve cover groove. Inspect for
dryness, cracking, or cuts.
10. Install the outer baffle (
D
) into the breather cover with the
three bosses facing out.
11. Install the breather cover (
C
) and baffle onto the valve
cover.
12. Start 2 fasteners (
B
) and alternately tighten to
43 lb-in
(4.9 Nm).
129
Summary of Contents for BIG BLOCK M540000
Page 46: ...Special Tools Image Chart 30 47...
Page 74: ...84 75...
Page 75: ...85 76 vanguardpower com...
Page 81: ...94 82 vanguardpower com...
Page 111: ...Vanguard Model 540000 145 112 vanguardpower com...
Page 113: ...Vanguard Model 610000 146 114 vanguardpower com...
Page 136: ...176 137...