E5
−
H High Performance Universal Inverter User Manual
10
Chapter 2 Inverter Installation
"
Note:
When the E5
−
H
−
4T7.5G and below power class inverters are mounted side by side in the cabinet,
please remove the upper dust filter and the lower leading board.
Figure 2
−
2 Mounting direction and space for E5
−
H
−
4T11G and above power class
2.3 Removal and Mounting of Operation Panel and Cover
2.3.1 Removal and Mounting of Operation Panel
Removal of operation panel
As shown in Figure 2
−
3, the grab the operation panel forcefully in direction 1, and then lift the panel
body in direction 2.
Mounting of operation panel
As shown in Figure 2
−
4, align with the lower clamping position of the operation panel in direction 1,
and then press down the operation panel in direction 2, until the “crack” sound is heard.
Do not mount the operation panel in any other direction; otherwise, the operation panel will have
poor contact.
Above 100mm
Above 100mm
Above 100mm
Above 100mm
Air circulation
position
Air circulation
position
Above 200mm
Above 200mm
Air circulation position
Above 200mm
Air circulation position
Above 200mm