![Valor H5 1100MN Installation Manual Download Page 23](http://html1.mh-extra.com/html/valor/h5-1100mn/h5-1100mn_installation-manual_3616650023.webp)
23
Rear take-o
ff
16-1/2”
Top take-o
ff
17-1/2”
20” with LDK kit
1130CIK Clean Install Kit
x
x
Appliance Depth in Framing—with 1130CIK Clean
Install Kit
The 1130CIK installs to the appliance during the framing
stage and the appliance’s position is
fi
xed in the
framing. Wall
fi
nishes are then applied over top of the
fl
anges and butted up to the frame of the 1130CIK.
1130CIK Clean Install Kit,
fi
xed position
•
side stud brackets
supplied with appliance
not required
• appliance
positioning brackets
supplied on appliance
not
required
• appliance
convection gap
fi
ller brackets
supplied on
appliance
not required
•
appliance inboard side trim
fi
xing brackets not required
x
x
x
x
x
NOTE
Non-combustible wall finish material is required
above the unit, see page 26.
Planning
Framing—1130CIK Clean Install Kit