![background image](http://html1.mh-extra.com/html/valley/classicplus/classicplus_owners-manual_3236453034.webp)
Valley ClassicPlus Control Panel
34
Operation
Percent Timer Setting Calculation Worksheet
1. Determine Machine Length.
SL = __________ feet
SL = __________ Meters
2. Determine the End Tower Rotational Speed at 100% Timer Setting.
Speed = __________ ft/min
Speed = __________ M/min
3. Determine Inches (millimeters) Per Day the machine will apply.
Inches Per
Day
=
(GPM) (735.3)
Millimeters
Per Day
=
(LPS) (735.3)
(SL)
2
(SL)
2
= ( ) (735.3)
= ( ) (735.3)
( )
2
( )
2
=
( )
=
( )
( )
( )
=
_______
=
_______
4. Determine Hours Per Revolution at 100 Percent Timer Setting.
Hours Per
Revolution
at 100%
= (0.105) (DLRDU in ft)
Hours Per
Revolution
at 100%
= (0.105) (DLRDU in M)
(Speed in ft/min)
(Speed in M/min)
=
(0.105) ( )
=
(0.105) ( )
( )
( )
=
( )
=
( )
( )
( )
=
_______
=
_______
5. Determine Inches (millimeters) Per Revolution at 100 Percent Timer Setting.
Inches Per
Revolution
at 100%
=
(Hrs/Rev) (In/Day)
Millimeters
Per
Revolution
at 100%
=
(Hrs/Rev) (mm/Day)
24
24
=
( ) ( )
=
( ) ( )
24
24
=
( )
=
( )
24
24
=
_______
=
_______