43
Installation instructions geoTHERM VWS/VWW 0020051574_01
• Attach the upper casing and screw it down securely
with the two associated screws.
• Press the pipe access cover into the spring retainer.
AB
B
A1
2-
30
-0
1
AB
B
A
12
-3
0-0
1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L3
L2
L1
N
N
PE
L3
L2
L1
S
S
N
PE
L2
L1
L3
N
AB
B
A8
-3
0-
01
ABB
A
8-
30
-0
1
AB
B
A
8-
30
-0
1
1
L
L
L
L
L
1
L
N
N
N
N
N
2
N
2
1
2
1
L
N
2
3
4
5
SC
H
6
7
8
AS
B
N
N
Au
f
Zu
L
N
1
2
1
2
1
2
1
2
1
2
1
2
DC
F O
T
AF
-
+
Au
f
Zu
ZH
N
L
ZP
N
L SK
2-
P
N
L
HK
2-
P
HK
2
VF
2
RF
1
VF
1
SP
BU
S
DC
F/A
F
EV
U
1x
ZP
LP
/U
V
1
AB
B
A
12
-3
0-
01
Fig. 6.26 Fitting and connecting the operating console
• Connect the connecting cable to the operating con-
sole.
AB
B
A1
2-
30
-0
1
AB
B
A1
2-
30
-0
1
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L2
L1
N
PE
L3
L3
L2
L1
N
N
PE
L3
L2
L1
S
S
N
PE
L2
L1
L3
N
AB
B
A8
-3
0-
01
AB
B
A8
-3
0-
01
AB
B
A8
-3
0-
01
1
L
L
L
L
L
1
L
N
N
N
N
N
2
N
2
1
2
1
L
N
2
3
4
5
SC
H
6
7
8
AS
B
N
N
Au
f
Zu
L
N
1
2
1
2
1
2
1
2
1
2
1
2
DC
F O
T
AF
-
+
Au
f
Zu
ZH
N
L
ZP
N
L SK
2-
P
N
L
HK
2-
P
HK
2
VF
2
RF
1
VF
1
SP
BU
S
DC
F/A
F
EV
U
1x
ZP
LP
/U
V
1
AB
B
A1
2-
30
-0
1
Fig. 6.27 Fitting the front column of the operating console
• Insert the front column of the operating console into
the spring retainer on the console frame.
7 Start-up
d
Danger!
Risk of injury!
The heat pump may only be put into op-
eration after all the cladding sections
have been fitted.
7.1
General points regarding start-up
• Before putting the heat pump into operation, first
check the Start-up Checklist in Chap. 14.
The heat pump may only be started if all the points
noted there have been satisfied.
Before you actually start up the heat pump, familiarise
yourself with the controller interface described below.
Electrical installation 6
Start-up 7