Installation instructions geoTHERM VWS/VWW 0020051574_01
34
6.6.4 Direct heating operation and domestic hot
water cylinder (Hydraulic plan 3)
The heat pump is connected directly to the underfloor
heating circuit. Control system is carried out using ener-
gy balance control by default (see Chap. 8.4.2). The VF2
flow temperature sensor must be connected (floor pro-
tection circuit).
The heat pump also supplies a domestic hot water cylin-
der.
Fig. 6.10 Hydraulic plan 3
6 Electrical installation