MAINTENANCE
77
8
MAINTENANCE
This chapter primarily covers keeping the system in proper working condition. Periodic maintenance can im-
prove capacity utilization by preventing malfunctions and unplanned downtime. The prerequisite is efficient
planning of maintenance work and materials. For safe maintenance by appropriately trained personnel, ob-
serve the following:
DANGER!
Risk of death due to electrical current!
Contact with live components (conductor rail) may result in life-threatening injuries.
►
Ensure that the relevant components are not live and protected against unautho-
rized access.
NOTICE!
The inspection and maintenance tasks listed in the technical documentation must be
performed and documented regularly:
(Location, spare part, task performed, date, name of inspector).
►
Only persons with the required training, qualification and authorization may per-
form troubleshooting work on the system.
Date
Name
Service/
maintenance
Instructions
given by
Signature
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...