
COMMISSIONING
65
NOTICE!
Tightening torques in accordance with DIN VDE 0220
T2
►
M10 = 44 Nm
►
M5 = 5 Nm
Step 2
Assembly steps:
1. Tighten the cable gland until it is sealed against
the connecting cable.
Step 3
Assembly steps:
1. Replace the cover and close the connection box.
End feed VEKS 10
The end feed consists of a connection box and the VLS feed (see Line feed VLS)
Step 1
Assembly steps:
1. Slide the end feed to the left or right onto one of
the conductor rail ends of the VLS line feed.
Step 2
Required tools:
⚒
Screwdriver
Assembly steps:
1. Secure the box with two screws. The screws are
included in the packaging unit.
2. Then pull the cables through the insulation pro-
file and the cable gland.
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...