COMMISSIONING
70
6.5.4
Special components
Transfer funnel
The transfer funnels are equipped with a conductor rail section. The transfer funnel can be mounted on the
left and right of prepared VKS straight sections.
NOTICE!
Risk of damage to the current collectors and transfer funnels.
►
The stroke and deflection tolerances of the current collectors in the entrance area of the transfer funnels
are limited to max. 10 mm in all directions. The speed is max. 100 m/min
Step 1
Required tools:
⚒
Wrench
Assembly steps:
1. Install the pillar according to the installation plan.
2. Attach the retaining plate to the pillar.
Step 2
Required tools:
⚒
Wrench
Assembly steps:
1. Attach the HRL hanger to the retaining plate.
Step 3
Required tools:
⚒
Wrench
Assembly steps:
1. Screw the HRL support profile to the HRL hanger.
2. Mount the conductor rail in the HRL support pro-
file (see 6.5.1 Conductor system).
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...