COMMISSIONING
52
CAUTION!
During installation work, there is risk of suffering crush injuries to the limbs in the ar-
eas between the individual parts!
During installation work, there is risk of suffering crush injuries to the limbs in the ar-
eas between the individual parts.
►
Watch out for your limbs.
►
Wear personal protective equipment. (see chapter: 2 )
NOTICE!
The conductor rail material is susceptible to corrosion.
Corrosion can occur when working on the conductor rail with tools.
►
Only tools that have not previously been used for ferritic materials may be used.
►
Use own tools for the different materials (aluminum, copper, stainless steel).
►
Chip-forming work (grinding etc.) must not be performed in the vicinity of the con-
ductor rail system.
NOTICE!
The following points have to be strictly observed during assembly!
►
Appropriate handling of materials.
►
Clean and metallic bright surfaces on all contact points.
►
Smooth crossovers, free of burrs, of the conductor rail profiles at the ends in order
to avoid breakdowns and a high carbon brush wear.
►
Firm tightening of all screws using the screw lock provided and observing the stat-
ed tightening torques.
►
Exact alignment of the conductor rail to the guide system.
►
Damaged materials must not be installed.
►
Observe all applicable regulations governing installation of the plant.
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...