LAYOUT AND FUNCTION
21
(1)
Conductor rails connected in parallel
4.3.4
Fixed hangers/sliding hangers
All sections must be fastened at least twice, with the maximum hanger spacing of 1.2 m being observed. The
hanger brackets designed as sliding hangers allow three different types of fastening:
1) Installation in VAHLE support profile (clip fastening system)
2) Installation in C rail (screw fastening)
3) Installation on support brackets (screw fastening)
NOTICE!
The conductor system can slide in the hangers in case of longitudinal expansion. It is secured in the hanger
by an additional screw at fixed points. Here, a maximum distance of 6 m between two fixed points must be
maintained.
VM-SV10-8/63-100
0.445
8
781 156
VM-SV10-8/120-140
0.445
8
781 158
VM-SV10-9/63-100
0.460
9
781 159
VM-SV10-9/120-140
0.460
9
781 161
VM-SV10-9/200
(1)
0.460
9
781 162
VM-SV10-9/240-280
(1)
0.460
9
781 163
VM-SV10-10/63-100
0.475
10
781 164
VM-SV10-10/120-140
0.475
10
781 166
VM-SV10-10/200
(1)
0.475
10
781 167
VM-SV10-10/240-280
(1)
0.475
10
781 168
Type
Weight [kg]
Number of poles
ID no.
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...