COMMISSIONING
57
Step 3
Assembly steps:
1. Screw the section to the intended fixed hanger
using the screw.
NOTICE!
►
Each section must be equipped with a fixed hang-
er. The distance between two fixed hangers must
not exceed 6 m.
NOTICE!
Range of application - 10° C to + 55° C
6 m lengths for restricted temperature range
Δ
T
≤
5 0 ° C :
►
from 10° C to + 40° C delivery length > 4 m
►
from - 30° C to + 20° C delivery length = 4 m
Step 4
Prerequisites:
Before inserting, the springs must be checked for
proper contact with the connector rail.
During insertion, the springs must point towards
the curvature of the conductor rail profile.
Required tools:
⚒
Tape measure
Assembly steps:
1. Slide the connectors into the conductor rail pro-
files on the section with an even projection of 90
mm.
NOTICE!
Risk of damage to the conductor rail.
►
The connectors are assigned as shown in the di-
agram on the left and in the table on page 60.
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...