![Vahle VKS10 Translation Of The Original Instructions Download Page 66](http://html.mh-extra.com/html/vahle/vks10/vks10_translation-of-the-original-instructions_848504066.webp)
COMMISSIONING
64
NOTICE!
►
Tightening torque M6 = 7 Nm. Standard cable
outlet on left, right also possible.
Step 3
Assembly steps:
1. Place the cover cap on the conductor rail and pay
attention to cable routing.
Step 4
Assembly steps:
1. The cable outlet is at the side (left or right) of the
cable connection.
TIPS AND RECOMMENDATIONS!
The connecting cables for the VLS line feeds can also
be supplied pre-assembled (preferably rubber hose
line HO7RN-F/H07V-K).
Line feed VNS
Step 1
Required tools:
⚒
Screwdriver
⚒
Torque wrench
Assembly steps:
1. Open the cover on the installed line feed
2. Strip and cut the connecting wires as required.
3. Attach the cable lugs to the single wires and pass
the connecting cable through the cable gland.
4. Screw the cable lugs to the connecting pins with
the hexagon screws (M10, M5), lock washers and
hexagon nuts.
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...