3N0/3NK/3PD/3PG
1-4-43
8800
Document finisher main
program error
Document finisher main pro-
gram error at power up.
DF main PWB
1. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
DF main PWB (YC4) and Engine PWB
(YC18)
2. If the wiring is disconnected, shorted or
grounded, replace the wiring.
3. Replace the DF main PWB. (see page
Engine PWB
1. Check the engine software and upgrade
to the latest, if necessary.
2. Replace the engine PWB
8900
Document finisher backup
error
Read and write data does not
match 3 times in succession.
DF main PWB
1. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
DF main PWB (YC4) and Engine PWB
(YC18)
2. If the wiring is disconnected, shorted or
grounded, replace the wiring.
3. Replace the DF main PWB. (see page
8990
DF Setup error
When a bridge unit is unde-
tectable in the state where DF
is connected.
When a bridge unit is detected
in the state where DF is not
connected.
Bridge unit
Document finisher
1. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
DF main PWB (YC4) and Engine PWB
(YC18) (3000-sheet finisher)
DF main PWB (YC7) and Engine PWB
(YC18) (1000-sheet finisher)
2. If the wiring is disconnected, shorted or
grounded, replace the wiring.
DF main PWB
Replace the DF main PWB(Refer to the
service manual for the document finisher).
Engine PWB
Replace the engine PWB. (see page 1-5-33)
Code
Contents
Causes
Check procedures/
corrective measures
Summary of Contents for AK 740
Page 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 4: ...Revision history Revision Date Pages Revised contents ...
Page 5: ...This page is intentionally left blank ...
Page 11: ...This page is intentionally left blank ...
Page 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Page 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Page 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Page 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Page 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Page 170: ...AK 740 Bridge unit Installation Guide ...
Page 172: ...MT 730 B Mail box Installation Guide ...