3N0/3NK/3PD/3PG
1-3-8
U240
Method: [Solenoid]
1. Select the item to be operated.
2. Press the start key. The operation starts.
Method: [Mail Box]
1. Select the item to be operated.
2. Press the start key. The operation starts.
Completion
Press the stop key. The screen for selecting a maintenance item No. is displayed.
Item No.
Description
Display
Description
Sort Test
DF shift motor 1, 2 (DFSFM1, 2) is turned on
Eject Unlock(30)
DF eject release motor (DFERM) drive position 30-sheet stack
Eject Unlock(50)
DF eject release motor (DFERM) drive position 50-sheet stack
Eject Unlock(Fix)
DF eject release motor (DFERM) fixed drive position
Eject Unlock(Full)
DF eject release motor (DFERM) full open drive position
Punch
Punch motor (PUM) is turned on
Punch Move
Punch slide motor (PUSLM) is turned on
Display
Description
Sub Tray
DF feedshift solenoid (DFFSSOL) is turned on
Save Drum
DF drum solenoid (DFDRSOL) is turned on
Punch
Punch solenoid (PUSOL) is turned on
Display
Description
Conv
MB drive motor (MBDM) is turned on at paper conveying
Branch
MB drive motor (MBDM) is turned on at feedshift operation
Summary of Contents for AK 740
Page 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 4: ...Revision history Revision Date Pages Revised contents ...
Page 5: ...This page is intentionally left blank ...
Page 11: ...This page is intentionally left blank ...
Page 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Page 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Page 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Page 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Page 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Page 170: ...AK 740 Bridge unit Installation Guide ...
Page 172: ...MT 730 B Mail box Installation Guide ...