3N0/3NK/3PD/3PG
1-5-8
5. Measure the distance between the rub-
ber of the main tray ejection roller and
the ejection roller of the bundle ejection
unit.(a block gauge is required for mea-
surement.)
6. Check that the gap (A) is within the
range of 3.5 to 5.5 mm.
*: If the gap (A) is less than 3.5 mm, per-
form the ejection roller - roller interval
adjustment as 2. below.
Figure 1-5-10
2. DF ejection roller, adjustment of roller intervals
1. Remove the lid rear cover.
(see page 1-5-2)
2. Remove the DF upper rear cover.
(see page 1-5-2)
Figure 1-5-11
Main tray eject roller
Eject pulley
Eject pulley
Main tray eject roller
Gap (A)
Summary of Contents for AK 740
Page 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 4: ...Revision history Revision Date Pages Revised contents ...
Page 5: ...This page is intentionally left blank ...
Page 11: ...This page is intentionally left blank ...
Page 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Page 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Page 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Page 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Page 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Page 170: ...AK 740 Bridge unit Installation Guide ...
Page 172: ...MT 730 B Mail box Installation Guide ...